×

Livrables

Livrables

Le travail du projet PERFECT est présenté sous la forme de différents rapports, documents, matériaux et produits logiciels à réaliser. Certains livrables dépendent d’autres livrables qui sont achevés en premier et produisent plusieurs jalons successifs.

Une liste de tous les livrables inclus dans le projet PERFECT LIFE est présentée ci-dessous: (SEULEMENT EN ANGLAIS)

 

  • D1.1. Dissemination and communication plan
  • E1.1. Consortium Agreement and meeting calendar
  • C4.1. Report on the current data on pesticide application costs and inputs
  • D1.2. Initial dissemination material: leaflet, notice boards, pendrives, etc.
  • D1.3. Project webpage and information about the project in each partner website
  • C3.1. Report of the results of the first survey questionnaire
  • D1.7. Database with some information on the main LIFE projects which have relation with this project
  • A1.1. Report: Description of the collaborating farms and the orchard/vineyard. Detailed protocol of experimental design for assessing OVRA tools and direct and indirect measures of pesticide drift
  • E1.3. Green Procurement Strategy
  • D1.4. Report with minutes and information about Infodays
  • C5.1. First report on evaluation of project output indicators
  • B3.1. Map of the concentration level of pesticides, metabolites and coadjuvants at the application area and in the surroundings (direct measurements) and results of the level of indirect measurements
  • B4.1. Report with the results of direct biomonitoring and indirect dermal exposure of operators and bystanders
  • B1.1. APP Dosaviña OVRA tool for website and smartphone
  • B1.2. Report on the results of field evaluation of Dosaviña tool in alternative trellis system and field evaluation of Citrus Vol tool
  • D1.5. Revised dissemination and communication plan
  • C5.2. First updated report on evaluation of project output indicators
  • B3.2. Updated map and database of the concentration level of pesticides and related products
  • B3.3. Report on the validation in field conditions of the DMA-MS prototype developed by SEADM
  • B2.1. First Report on the performance of the instrument for the analysis of pesticides and related compounds
  • B4.4. Upload data results of direct biomonitoring of operators and bystanders to EU Information Platform for Chemical Monitoring
  • B3.4. Report with the results of the comparison between direct and indirect measures of pesticide losses in the environment
  • D1.6. Report with minutes/conclusions of the project workshops
  • C5.3. Second updated report on evaluation of project output indicators
  • E1.2. Consrotium Internal annual report (different from the reporting reports)
  • B4.2. Updated report with the results of direct biomonitoring and indirect dermal exposure of operators and bystanders
  • B1.3. Updated Report on the results of field evaluation of Dosaviña tool in alternative trellis system and field evaluation of Citrus Vol tool
  • B5.1. Report on results of atmospheric degradation of active substances and/or coadjuvant metabolites or other related compounds
  • B6.1. Publication about the project results in the Journal of CACV
  • B6.2. Publications on local farmer magazines
  • C1.1. Report of environmental impact of the use of OVRA tools and SDR techniques
  • C4.2. Communication and dissemination plan for future commercialization of SEADM’s DMA-MS system
  • B7.2. Replicability and transferability plan
  • B4.3. Report on the relationship between direct and indirect measures
  • B6.3. Report about training days
  • C2.1. Report on the risk assessment in operators and bystanders
  • B7.1. Bussiness plan of the SEADM instrument
  • C 3.2. Report: Behavioural farmers change
  • C2. Recommendations to EFSA about specific Mediterranean agronomic conditions in the assessment of pesticide exposure of operators, workers, residents and bystanders
  • D1.8. Dissemination material with project results: project video, leaflet, pendrives, Layman's Report, etc.
  • D1.9. Report on the final event with the presentation of the project results andpresentation of other LIFE projects
  • E2.1. After-life communication plan in English and electronic format
  • C5.4. Final report on evaluation of project output indicators