×

Deliverables

Deliverables

The work of the PERFECT project is presented as different reports, documents, materials and software products to be achieved. Some deliverables are dependent on other deliverables being completed first and producing multiple successive milestones. 

A list of all the deliverables enclosed in the PERFECT LIFE project is presented below:

  • D1.1. Dissemination and communication plan (Public)
  • E1.1. Consortium Agreement and meeting calendar (Confidential, only for members of the consortium (including the Commission Services))
  • C4.1. Report on the current data on pesticide application costs and inputs
  • D1.2. Initial dissemination material: leaflet, notice boards, pendrives, etc. (Public)
  • D1.3. Project webpage and information about the project in each partner website (Public)

  • C3.1. Report of the results of the first survey questionnaire
  • D1.7. Database with some information on the main LIFE projects which have relation with this project (Public)

  • A1.1. Report: Description of the collaborating farms and the orchard/vineyard. Detailed protocol of experimental design for assessing OVRA tools and direct and indirect measures of pesticide drift
  • E1.3. Green Procurement Strategy
  • D1.4. Report with minutes and information about Infodays
  • C5.1. First report on evaluation of project output indicators
  • B3.1. Map of the concentration level of pesticides, metabolites and coadjuvants at the application area and in the surroundings (direct measurements) and results of the level of indirect measurements
  • B4.1. Report with the results of direct biomonitoring and indirect dermal exposure of operators and bystanders
  • B1.1. APP Dosaviña OVRA tool for website and smartphone
  • B1.2. Report on the results of field evaluation of Dosaviña tool in alternative trellis system and field evaluation of Citrus Vol tool
  • D1.5. Revised dissemination and communication plan
  • C5.2. First updated report on evaluation of project output indicators
  • B3.2. Updated map and database of the concentration level of pesticides and related products
  • B3.3. Report on the validation in field conditions of the DMA-MS prototype developed by SEADM
  • B2.1. First Report on the performance of the instrument for the analysis of pesticides and related compounds
  • B4.4. Upload data results of direct biomonitoring of operators and bystanders to EU Information Platform for Chemical Monitoring
  • B3.4. Report with the results of the comparison between direct and indirect measures of pesticide losses in the environment
  • D1.6. Report with minutes/conclusions of the project workshops
  • C5.3. Second updated report on evaluation of project output indicators
  • E1.2. Consrotium Internal annual report (different from the reporting reports)
  • B4.2. Updated report with the results of direct biomonitoring and indirect dermal exposure of operators and bystanders
  • B1.3. Updated Report on the results of field evaluation of Dosaviña tool in alternative trellis system and field evaluation of Citrus Vol tool
  • B5.1. Report on results of atmospheric degradation of active substances and/or coadjuvant metabolites or other related compounds
  • B6.1. Publication about the project results in the Journal of CACV
  • B6.2. Publications on local farmer magazines
  • C1.1. Report of environmental impact of the use of OVRA tools and SDR techniques
  • C4.2. Communication and dissemination plan for future commercialization of SEADM’s DMA-MS system
  • B7.2. Replicability and transferability plan
  • B4.3. Report on the relationship between direct and indirect measures
  • B6.3. Report about training days
  • C2.1. Report on the risk assessment in operators and bystanders
  • B7.1. Bussiness plan of the SEADM instrument
  • C 3.2. Report: Behavioural farmers change
  • C2. Recommendations to EFSA about specific Mediterranean agronomic conditions in the assessment of pesticide exposure of operators, workers, residents and bystanders
  • D1.8. Dissemination material with project results: project video, leaflet, pendrives, Layman's Report, etc.
  • D1.9. Report on the final event with the presentation of the project results andpresentation of other LIFE projects
  • E2.1. After-life communication plan in English and electronic format
  • C5.4. Final report on evaluation of project output indicators